Client
UGL Limited
Scope
Lai Switchboard were engaged by UGL Limited to design and manufacture the required switchboards and deliver them within a 12 week time line.
The switchboards supplied for this project included:
- 2x 2000A Grid Connection Cubicles
- 22x Sub Array Switchboards
Value
250 K
Time Frame
16 Weeks
Delivered
12 Weeks
Comments
Mount Majura Solar farm is a 2.3MW solar farm located 15km north-east of Canberra.
Lai Switchboards worked closely with UGL Limited to design and manufacture the switchboards to meet the requirements of the relevant standards while also meeting the client’s requirements for size limitations and a fast delivery.
The Lai Switchboards team were able to manufacture the 22x Sub Array Switchboards in less than 2 weeks from receiving approval to manufacture.