Lai Switchboard were engaged by UGL Limited to design and manufacture the required switchboards and deliver them within a 12 week time line.
The switchboards supplied for this project included:
- 2x 2000A Grid Connection Cubicles
- 22x Sub Array Switchboards
READ MORESupply of switchroom, Low Voltage Switchboards and protection Panels
READ MORE